300 kVA Diesel Generator for Factories: Cummins, Perkins or Weichai?
For a factory considering UleenGen’s 300 kVA diesel generators, Cummins, Perkins and Weichai each have a listed 50 Hz candidate. The UC300GF, UP300GF and UW300GF all appear at 240 kW / 300 kVA. Choosing among them depends on the factory’s approved engine options, operating brief and budget for the complete installation.
A practical shortlist begins with those three models. Cummins or Perkins may satisfy an existing brand requirement. Weichai gives a brand-flexible purchasing team another proposal to evaluate against its budget. The final recommendation needs the offered configuration and current commercial terms for each candidate.

Why 300 kVA Diesel Generators Are a Practical Choice for Factories
A 300 kVA set is worth considering when an electrical assessment places the factory’s required output in this class. The three UleenGen examples pair 300 kVA with 240 kW. The assessment still needs to address the actual operating duty and the loads that must run during a supply interruption.
That might mean a defined production area, essential processing equipment or an agreed combination of machinery and utilities. The buyer should identify the loads included in the project before requesting brand alternatives. If the requirement changes during procurement, the technical selection and price need to be checked again.
El 50 Hz industrial generator specifications provide a starting shortlist within this power class. Ask for the model’s prime and standby ratings under the proposed operating conditions, including the installation’s temperature and altitude. This establishes the output being purchased for the factory.
Once that requirement is settled, procurement can compare three engine options against the same factory brief. The discussion then has a defined power requirement and a common installation scope.
Cummins vs Perkins vs Weichai 300 kVA Model Comparison
The following configurations are listed in UleenGen’s 50 Hz table.
|
Brand and genset |
Listed engine model |
Listed output |
Overall size L × W × H mm |
Gross weight kg |
|
Cummins UC300GF |
MTAA11-G3 |
240 kW / 300 kVA |
3,010 × 1,000 × 1,700 |
2,600 |
|
Perkins UP300GF |
1506A E88TAG5 |
240 kW / 300 kVA |
3,030 × 1,120 × 1,800 |
2,500 |
|
Weichai UW300GF |
WP10D320E200 |
240 kW / 300 kVA |
3,100 × 1,200 × 1,600 |
2,800 |
These dimensions and weights apply to the three named GF catalog configurations. UC300GF has the narrowest listed width. UP300GF has the lowest listed gross weight and the greatest height. UW300GF has the lowest listed height, together with the greatest width and gross weight. Keep any GFS or alternative-engine proposal separate until its finished enclosure, tank and handling details have been confirmed.
El Perkins-powered UP300GF specification supplies a further reference for that engine option. Confirm the offered configuration against the requested duty. The 240 kW catalog entry still needs its applicable rating basis stated in the project proposal.
These dimensions describe the listed packages. A factory layout also needs ventilation, connection and access clearances from the approved installation drawing. Include the same alternator, controller and requested accessories when comparing the final offers.

Which Brand Fits Different Factory Purchasing Budgets?
For a factory working to an approved capital ceiling, ask for a UW300GF proposal including the required enclosure, controls and delivery. Its 1,600 mm listed height makes it worth reviewing where the planned equipment envelope is low. The factory must also accommodate its 1,200 mm width and 2,800 kg listed gross weight. Any purchase saving should be assessed after the relevant handling and site work are priced.
Check whether each proposed 300 kVA rating is prime or standby before comparing budgets. UC300GFS, for example, pairs an NTA855-G1A engine with 240 kW / 300 kVA standby output. It is a different engine configuration from the MTAA11-G3-powered UC300GF above. A factory seeking 300 kVA prime output should request an explicitly confirmed prime rating rather than accept a standby label as equivalent. Price the technically acceptable candidates first.
A factory with Cummins in its approved equipment specification can begin with the UC300GF. Its listed 1,000 mm width also gives the project team a specific layout to investigate where an access route is constrained. Obtain the finished drawing and handling arrangement before deciding whether it fits. Procurement should identify who can approve any alternative engine proposal.
Perkins deserves consideration where the factory already specifies that platform. The 1506A-E88TAG5 engine has an 8.8-litre displacement. UP300GF is the lightest listed GF candidate at 2,500 kg, while its listed height is 1,800 mm. The separately designated UP300GFS has 240 kW / 300 kVA prime output and 264 kW / 330 kVA standby output. Its silent package is listed at 3,800 × 1,300 × 2,200 mm and 2,800 kg. Use the offered package’s dimensions and weight when arranging placement, and confirm support for that exact engine.
Where both Cummins and Perkins are accepted, obtain separate offers and compare the actual packages. Their relative prices can change with components, supply availability and delivery conditions. The factory needs current proposals to decide which one fits its budget and acceptance requirements.
Ask the team pricing transport and site work to use the same three candidate configurations. A saving on equipment can be reduced by additional placement work. Equally, an initially more expensive set may have a useful project-cost advantage if a documented installation difference reduces other work. Obtain actual prices for those differences before approving the budget.
What Affects the Final Price of a 300 kVA Generator?
The engine choice is one part of the price. Alternator selection and controller requirements should appear by model in the commercial proposal. The factory can then see whether a change in engine also changes other equipment it intends to purchase.
Enclosure requirements deserve particular attention. A factory planning an indoor equipment room has a different installation brief from one planning an outdoor acoustic enclosure. The proposal needs to reflect the actual arrangement, including any requested noise data and the conditions under which it was measured.
Transfer equipment and electrical integration can also change the project total. Specify whether the order includes an automatic transfer switch, the required switching arrangement and any agreed communications. Obtain the relevant electrical drawings for review so the purchased equipment can be checked against the factory installation plan.
The fuel tank is another scope item to settle. State the required operating period and ask the supplier to size the proposed arrangement from consumption at the expected load. Distinguish g/kWh from L/h: the first is a specific-consumption measure, while the second is a volume per hour. Confirm the rating, test basis and any conversion assumptions before turning a fuel figure into a factory operating budget.
Finally, put transport, packing, unloading, installation and commissioning into the cost allocation. The supplier’s dispatch date and the factory’s required operating date describe different stages of the project. Allow for the work between them and agree who is responsible for each stage.
Choosing the Right Generator for Your Factory
Start with the accepted models. If all three engines are permitted, request three offers based on the same approved technical brief. If an engine brand is mandatory, identify that requirement in the enquiry so the supplier can concentrate on an acceptable proposal.
Have engineering review each accepted model against the same factory layout. The comparison should identify whether its width, height, handling weight or connection arrangement changes the planned work. Procurement can then add the priced consequences to each equipment offer. Keep the quotation validity and the required operating date with that comparison.
For an alternative-brand proposal, record the reason for accepting it. A UW300GF may offer a better acquisition-cost result if its comparable total is lower and its technical submission is approved. A UC300GF or UP300GF may fit an established engine policy that the factory wants to retain. Each choice should have an order-specific reason.
Before award, have UleenGen identify the proposed generator support and spare-parts arrangements for the destination. Agree the applicable warranty and handover documents for the purchased package. These are procurement commitments that the factory can review alongside price and delivery.
The selected offer should leave a traceable record of the model, accepted scope and agreed commercial conditions. That gives production, engineering and procurement the same description of what will arrive.
For a phased factory expansion, retain the approved load brief with that record. Additional production equipment can change the requirement before delivery. Refer the revised brief to the supplier so the team can confirm whether the selected package still fits the project and whether any change affects the order.
Preguntas frecuentes
Does every factory need a 300 kVA generator?
The required capacity depends on the assessed loads, operating duty and site conditions. This comparison applies after the factory’s selection process has identified the 300 kVA class as a candidate.
Which of the three brands is cheapest?
Use current quotations with matching equipment and delivery scope. Weichai is worth including in a budget-focused enquiry, while the actual price order must be established from the offers.
Is the UP300GF rated at 300 kW?
Its listed output is 240 kW / 300 kVA in the 50 Hz table. Confirm the prime or standby basis for the project before approving the technical schedule.
Should a factory accept a different engine after ordering?
Any proposed substitution needs a revised technical and commercial submission and approval through the factory’s purchasing process before the changed equipment is supplied.
Compare 300 kVA Generator Quotes from UleenGen
Send UleenGen your factory’s 300 kVA purchasing brief with the accepted engine brands, duty, electrical requirements, installation arrangement, destination and required operating date. Request separate UC300GF, UP300GF and UW300GF offers where all three are permitted. Ask each proposal to identify its components, included work and delivery terms for a direct purchasing comparison.